scoring concrete for a clean break
removing concrete to expose 6″ wye
broken clay wye
preparing liner
4″ liner installed and pressurized
liner installed and 4″ abs repair...
Read more...
3/4″ poly pipe installed at 18″ depth with tracer wire
grass cut out and dirt on plastic
ball valve at meter
main shut off at home, gas line pumped up and ready for test
like it never even happened, almost
passed inspection and all cleaned...
Read more...